Electrical quote checklist: 20 things to check
Tick each quote against this list. A blank box is a question to ask before you sign.
Tapeline · Electrical quote checklist · homequotecomparison.com
| What the quote should say | A | B | C |
|---|---|---|---|
| Scope | |||
| 1. Circuits and devices countCounts make quotes comparable.Ask: How many circuits, outlets and switches does this price include? | |||
| 2. Panel or service upgradePanel and service work is the biggest single cost driver.Ask: Is a panel or service upgrade included, and to what amperage? | |||
| 3. Drywall patchingRunning new wire often means openings.Ask: Is patching of wall and ceiling openings included? | |||
| 4. Utility coordinationService changes need the power company.Ask: Will you coordinate with the utility for any service change? | |||
| 5. Grounding and bondingOften required when a panel is upgraded.Ask: Is grounding and bonding brought up to code included? | |||
| 6. Panel labelingA labeled panel makes future work safer.Ask: Will you label the panel when you finish? | |||
| 7. InspectionInspection confirms the work is safe.Ask: Will you schedule and attend the electrical inspection? | |||
| Materials | |||
| 8. Wire type and sizeThe wrong wire for a circuit is a safety issue.Ask: What wire type and gauge will you use? | |||
| 9. Outlets, switches, GFCI and AFCICode-required protection may add cost.Ask: Are GFCI and AFCI protection included where code requires it? | |||
| 10. Light fixturesSupply versus installation is often unclear.Ask: Who supplies the fixtures, and is installation included? | |||
| Permit and site | |||
| 11. Permit and who pulls itUnpermitted work can fail inspection, complicate insurance claims and cause problems when you sell.Ask: Is the permit included in the price, and will you pull it in your name? | |||
| 12. Debris removal and cleanupDumpster and haul-away fees are a common add-on after the job starts.Ask: Is debris removal, including any dumpster and haul-away, included in the price? | |||
| 13. Protection of your homeDamage to floors, landscaping or furniture is easier to resolve when the quote says who is responsible.Ask: How will you protect the house and yard, and who pays if something is damaged? | |||
| Schedule and money | |||
| 14. Start date and durationWithout dates in writing, a job can slip for weeks with no recourse.Ask: What is your start date and how many working days will the job take? Can we put that in the contract? | |||
| 15. Payment scheduleA large upfront deposit puts more of your money at risk before work is done. Some states limit deposits.Ask: How much deposit do you need, and when is each payment due? | |||
| 16. Change-order processExtra work is where budgets usually grow. Written, pre-approved changes keep it under control.Ask: How are changes priced and approved? Will every change be in writing before the work is done? | |||
| 17. Written exclusionsWhat a price does not include matters as much as what it does.Ask: What is not included in this price? | |||
| Warranties and paperwork | |||
| 18. Workmanship warrantyThis covers the installation itself, which is separate from any product warranty.Ask: How long is your workmanship warranty, what does it cover, and does it transfer if we sell? | |||
| 19. Manufacturer warrantySome product warranties only apply if the installer registers them.Ask: Which product warranties apply, and who registers them? | |||
| 20. License and insurance proofIf an uninsured worker is hurt on your property, you could be exposed.Ask: Can you send your license or registration number and certificates for liability and workers' compensation insurance? | |||
General information, not professional advice. Local codes and licensing rules vary.