Checklists

General renovation quote checklist: 22 things to check

Tick each quote against this list. A blank box is a question to ask before you sign.

Compare quotes automatically
What the quote should sayABC
Scope
1. Room-by-room scopeA lump sum hides what's included.Ask: Can you break the price down room by room or by trade?
2. Plans and engineeringStructural changes may need drawings and an engineer.Ask: Are plans, drawings or engineering included if needed?
3. DemolitionDemolition and disposal are large line items.Ask: Is demolition included?
4. Structural workWalls and beams are high-risk, high-cost items.Ask: Is any structural work included, and has it been checked by an engineer?
5. Subcontractors and supervisionKnowing who does the work and who manages it avoids surprises.Ask: Which parts will subcontractors do, and who supervises day to day?
Systems
6. ElectricalRenovations usually trigger electrical updates.Ask: What electrical work is included?
7. PlumbingMoved fixtures mean moved pipes.Ask: What plumbing work is included?
8. Heating and coolingNew rooms need air.Ask: Is any heating, cooling or duct work included?
Materials
9. InsulationOpen walls are the cheapest time to insulate.Ask: Is insulation included in opened walls and ceilings?
Finishes
10. DrywallHanging and finishing drywall is a big labor item.Ask: Is drywall hanging and finishing included, and to what finish level?
11. Floors, paint and trimFinishes are where quotes differ most.Ask: Which flooring, paint and trim finishes are included?
Money
12. AllowancesLow allowances make a quote look cheaper than it will be.Ask: What allowances are in this quote, and what do they realistically buy?
Permit and site
13. Permit and who pulls itUnpermitted work can fail inspection, complicate insurance claims and cause problems when you sell.Ask: Is the permit included in the price, and will you pull it in your name?
14. Debris removal and cleanupDumpster and haul-away fees are a common add-on after the job starts.Ask: Is debris removal, including any dumpster and haul-away, included in the price?
15. Protection of your homeDamage to floors, landscaping or furniture is easier to resolve when the quote says who is responsible.Ask: How will you protect the house and yard, and who pays if something is damaged?
Schedule and money
16. Start date and durationWithout dates in writing, a job can slip for weeks with no recourse.Ask: What is your start date and how many working days will the job take? Can we put that in the contract?
17. Payment scheduleA large upfront deposit puts more of your money at risk before work is done. Some states limit deposits.Ask: How much deposit do you need, and when is each payment due?
18. Change-order processExtra work is where budgets usually grow. Written, pre-approved changes keep it under control.Ask: How are changes priced and approved? Will every change be in writing before the work is done?
19. Written exclusionsWhat a price does not include matters as much as what it does.Ask: What is not included in this price?
Warranties and paperwork
20. Workmanship warrantyThis covers the installation itself, which is separate from any product warranty.Ask: How long is your workmanship warranty, what does it cover, and does it transfer if we sell?
21. Manufacturer warrantySome product warranties only apply if the installer registers them.Ask: Which product warranties apply, and who registers them?
22. License and insurance proofIf an uninsured worker is hurt on your property, you could be exposed.Ask: Can you send your license or registration number and certificates for liability and workers' compensation insurance?

General information, not professional advice. Local codes and licensing rules vary.