General renovation quote checklist: 22 things to check
Tick each quote against this list. A blank box is a question to ask before you sign.
Tapeline · General renovation quote checklist · homequotecomparison.com
| What the quote should say | A | B | C |
|---|---|---|---|
| Scope | |||
| 1. Room-by-room scopeA lump sum hides what's included.Ask: Can you break the price down room by room or by trade? | |||
| 2. Plans and engineeringStructural changes may need drawings and an engineer.Ask: Are plans, drawings or engineering included if needed? | |||
| 3. DemolitionDemolition and disposal are large line items.Ask: Is demolition included? | |||
| 4. Structural workWalls and beams are high-risk, high-cost items.Ask: Is any structural work included, and has it been checked by an engineer? | |||
| 5. Subcontractors and supervisionKnowing who does the work and who manages it avoids surprises.Ask: Which parts will subcontractors do, and who supervises day to day? | |||
| Systems | |||
| 6. ElectricalRenovations usually trigger electrical updates.Ask: What electrical work is included? | |||
| 7. PlumbingMoved fixtures mean moved pipes.Ask: What plumbing work is included? | |||
| 8. Heating and coolingNew rooms need air.Ask: Is any heating, cooling or duct work included? | |||
| Materials | |||
| 9. InsulationOpen walls are the cheapest time to insulate.Ask: Is insulation included in opened walls and ceilings? | |||
| Finishes | |||
| 10. DrywallHanging and finishing drywall is a big labor item.Ask: Is drywall hanging and finishing included, and to what finish level? | |||
| 11. Floors, paint and trimFinishes are where quotes differ most.Ask: Which flooring, paint and trim finishes are included? | |||
| Money | |||
| 12. AllowancesLow allowances make a quote look cheaper than it will be.Ask: What allowances are in this quote, and what do they realistically buy? | |||
| Permit and site | |||
| 13. Permit and who pulls itUnpermitted work can fail inspection, complicate insurance claims and cause problems when you sell.Ask: Is the permit included in the price, and will you pull it in your name? | |||
| 14. Debris removal and cleanupDumpster and haul-away fees are a common add-on after the job starts.Ask: Is debris removal, including any dumpster and haul-away, included in the price? | |||
| 15. Protection of your homeDamage to floors, landscaping or furniture is easier to resolve when the quote says who is responsible.Ask: How will you protect the house and yard, and who pays if something is damaged? | |||
| Schedule and money | |||
| 16. Start date and durationWithout dates in writing, a job can slip for weeks with no recourse.Ask: What is your start date and how many working days will the job take? Can we put that in the contract? | |||
| 17. Payment scheduleA large upfront deposit puts more of your money at risk before work is done. Some states limit deposits.Ask: How much deposit do you need, and when is each payment due? | |||
| 18. Change-order processExtra work is where budgets usually grow. Written, pre-approved changes keep it under control.Ask: How are changes priced and approved? Will every change be in writing before the work is done? | |||
| 19. Written exclusionsWhat a price does not include matters as much as what it does.Ask: What is not included in this price? | |||
| Warranties and paperwork | |||
| 20. Workmanship warrantyThis covers the installation itself, which is separate from any product warranty.Ask: How long is your workmanship warranty, what does it cover, and does it transfer if we sell? | |||
| 21. Manufacturer warrantySome product warranties only apply if the installer registers them.Ask: Which product warranties apply, and who registers them? | |||
| 22. License and insurance proofIf an uninsured worker is hurt on your property, you could be exposed.Ask: Can you send your license or registration number and certificates for liability and workers' compensation insurance? | |||
General information, not professional advice. Local codes and licensing rules vary.