Painting quote checklist: 18 things to check
Tick each quote against this list. A blank box is a question to ask before you sign.
Tapeline · Painting quote checklist · homequotecomparison.com
| What the quote should say | A | B | C |
|---|---|---|---|
| Scope | |||
| 1. Rooms and surfacesWalls, ceilings and trim are often priced separately.Ask: Which rooms and surfaces (walls, ceilings, trim, doors) are included? | |||
| 2. Surface prepPrep decides how long the paint lasts.Ask: What prep is included: washing, scraping, sanding, caulking? | |||
| 3. RepairsPatching and wood repair are frequently extra.Ask: Are drywall patches or wood repairs included, and how are extra repairs priced? | |||
| 4. Number of colorsExtra colors can add cost.Ask: How many colors does this price allow? | |||
| 5. Lead-safe practices (pre-1978 homes)Homes built before 1978 may have lead paint; federal rules require certified renovators for some work.Ask: If our home was built before 1978, are you lead-safe certified and following lead-safe practices? | |||
| Materials | |||
| 6. PrimerSome surfaces need primer to hold the paint.Ask: Is primer included, and where? | |||
| 7. Paint brand, line and sheenPaint lines vary widely in quality.Ask: Which paint brand, product line and sheen are included? | |||
| 8. Number of coatsOne coat versus two changes both price and finish.Ask: How many coats are included? | |||
| Permit and site | |||
| 9. Permit and who pulls itUnpermitted work can fail inspection, complicate insurance claims and cause problems when you sell.Ask: Is the permit included in the price, and will you pull it in your name? | |||
| 10. Debris removal and cleanupDumpster and haul-away fees are a common add-on after the job starts.Ask: Is debris removal, including any dumpster and haul-away, included in the price? | |||
| 11. Protection of your homeDamage to floors, landscaping or furniture is easier to resolve when the quote says who is responsible.Ask: How will you protect the house and yard, and who pays if something is damaged? | |||
| Schedule and money | |||
| 12. Start date and durationWithout dates in writing, a job can slip for weeks with no recourse.Ask: What is your start date and how many working days will the job take? Can we put that in the contract? | |||
| 13. Payment scheduleA large upfront deposit puts more of your money at risk before work is done. Some states limit deposits.Ask: How much deposit do you need, and when is each payment due? | |||
| 14. Change-order processExtra work is where budgets usually grow. Written, pre-approved changes keep it under control.Ask: How are changes priced and approved? Will every change be in writing before the work is done? | |||
| 15. Written exclusionsWhat a price does not include matters as much as what it does.Ask: What is not included in this price? | |||
| Warranties and paperwork | |||
| 16. Workmanship warrantyThis covers the installation itself, which is separate from any product warranty.Ask: How long is your workmanship warranty, what does it cover, and does it transfer if we sell? | |||
| 17. Manufacturer warrantySome product warranties only apply if the installer registers them.Ask: Which product warranties apply, and who registers them? | |||
| 18. License and insurance proofIf an uninsured worker is hurt on your property, you could be exposed.Ask: Can you send your license or registration number and certificates for liability and workers' compensation insurance? | |||
General information, not professional advice. Local codes and licensing rules vary.