Checklists

Plumbing quote checklist: 19 things to check

Tick each quote against this list. A blank box is a question to ask before you sign.

Compare quotes automatically
What the quote should sayABC
Scope
1. Fixtures and pipes coveredA vague scope makes extras easy to add later.Ask: Exactly which fixtures and pipe runs does this price cover?
2. Access openingsGetting to pipes may mean opening walls or floors.Ask: Will you need to open walls, floors or ceilings to get to the pipes?
3. Drywall patching after accessPatching is frequently excluded.Ask: Is patching of any openings included, or is that left to us?
4. Shut-off valvesNew fixtures usually deserve new shut-offs.Ask: Are new shut-off valves included?
5. Pressure test and inspectionTesting catches leaks before walls are closed.Ask: Will you pressure-test the new lines and arrange the inspection?
6. Gas line workGas work needs the right license and a permit.Ask: Is any gas line work included, and are you licensed for it?
Materials
7. Pipe materialPEX, copper and others differ in cost and lifespan.Ask: What pipe material will you use?
8. Who supplies fixturesFixture supply is often assumed differently by each quote.Ask: Who supplies the fixtures, and is installation included?
9. Water heater detailsSize, venting and expansion tanks change the price.Ask: If a water heater is included: what make, size and venting, and is an expansion tank included?
Permit and site
10. Permit and who pulls itUnpermitted work can fail inspection, complicate insurance claims and cause problems when you sell.Ask: Is the permit included in the price, and will you pull it in your name?
11. Debris removal and cleanupDumpster and haul-away fees are a common add-on after the job starts.Ask: Is debris removal, including any dumpster and haul-away, included in the price?
12. Protection of your homeDamage to floors, landscaping or furniture is easier to resolve when the quote says who is responsible.Ask: How will you protect the house and yard, and who pays if something is damaged?
Schedule and money
13. Start date and durationWithout dates in writing, a job can slip for weeks with no recourse.Ask: What is your start date and how many working days will the job take? Can we put that in the contract?
14. Payment scheduleA large upfront deposit puts more of your money at risk before work is done. Some states limit deposits.Ask: How much deposit do you need, and when is each payment due?
15. Change-order processExtra work is where budgets usually grow. Written, pre-approved changes keep it under control.Ask: How are changes priced and approved? Will every change be in writing before the work is done?
16. Written exclusionsWhat a price does not include matters as much as what it does.Ask: What is not included in this price?
Warranties and paperwork
17. Workmanship warrantyThis covers the installation itself, which is separate from any product warranty.Ask: How long is your workmanship warranty, what does it cover, and does it transfer if we sell?
18. Manufacturer warrantySome product warranties only apply if the installer registers them.Ask: Which product warranties apply, and who registers them?
19. License and insurance proofIf an uninsured worker is hurt on your property, you could be exposed.Ask: Can you send your license or registration number and certificates for liability and workers' compensation insurance?

General information, not professional advice. Local codes and licensing rules vary.

Definition