Siding quote checklist: 19 things to check
Tick each quote against this list. A blank box is a question to ask before you sign.
Tapeline · Siding quote checklist · homequotecomparison.com
| What the quote should say | A | B | C |
|---|---|---|---|
| Materials | |||
| 1. Product, profile and colorSiding products vary widely.Ask: Which siding product, profile and color are included? | |||
| 2. House wrap or weather barrierIt keeps water out of the walls.Ask: Is new house wrap or a weather barrier included? | |||
| 3. Trim, soffit and fasciaOften priced separately.Ask: Are corners, trim, soffit and fascia included? | |||
| Scope | |||
| 4. Area in squaresQuotes for different areas can't be compared.Ask: How many squares of siding is this priced for? | |||
| 5. Old siding removalOverlay versus removal changes the job.Ask: Will the old siding be removed, or covered? | |||
| 6. Sheathing repair priceRotten sheathing is found only after removal.Ask: How much sheathing repair is included, and what does extra cost per sheet? | |||
| 7. Window and door flashingPoor flashing is the main cause of siding leaks.Ask: How will windows and doors be flashed? | |||
| 8. GuttersGutters usually come off to install siding.Ask: Will gutters be removed and reinstalled? | |||
| 9. Lead-safe practices (pre-1978 homes)Removing old painted siding can disturb lead paint.Ask: If our home was built before 1978, are you lead-safe certified? | |||
| Permit and site | |||
| 10. Permit and who pulls itUnpermitted work can fail inspection, complicate insurance claims and cause problems when you sell.Ask: Is the permit included in the price, and will you pull it in your name? | |||
| 11. Debris removal and cleanupDumpster and haul-away fees are a common add-on after the job starts.Ask: Is debris removal, including any dumpster and haul-away, included in the price? | |||
| 12. Protection of your homeDamage to floors, landscaping or furniture is easier to resolve when the quote says who is responsible.Ask: How will you protect the house and yard, and who pays if something is damaged? | |||
| Schedule and money | |||
| 13. Start date and durationWithout dates in writing, a job can slip for weeks with no recourse.Ask: What is your start date and how many working days will the job take? Can we put that in the contract? | |||
| 14. Payment scheduleA large upfront deposit puts more of your money at risk before work is done. Some states limit deposits.Ask: How much deposit do you need, and when is each payment due? | |||
| 15. Change-order processExtra work is where budgets usually grow. Written, pre-approved changes keep it under control.Ask: How are changes priced and approved? Will every change be in writing before the work is done? | |||
| 16. Written exclusionsWhat a price does not include matters as much as what it does.Ask: What is not included in this price? | |||
| Warranties and paperwork | |||
| 17. Workmanship warrantyThis covers the installation itself, which is separate from any product warranty.Ask: How long is your workmanship warranty, what does it cover, and does it transfer if we sell? | |||
| 18. Manufacturer warrantySome product warranties only apply if the installer registers them.Ask: Which product warranties apply, and who registers them? | |||
| 19. License and insurance proofIf an uninsured worker is hurt on your property, you could be exposed.Ask: Can you send your license or registration number and certificates for liability and workers' compensation insurance? | |||
General information, not professional advice. Local codes and licensing rules vary.