Windows & doors quote checklist: 19 things to check

Tick each quote against this list. A blank box is a question to ask before you sign.

Compare quotes automatically
What the quote should sayABC
Scope
1. Number and locationsCounts make quotes comparable.Ask: How many windows or doors, and in which openings, does this cover?
2. Full-frame or insert installInsert installs are cheaper but keep the old frame.Ask: Is this a full-frame or insert (pocket) installation?
3. Field measuringOrdering the wrong size delays everything.Ask: Will you take final measurements before ordering?
4. Flashing, insulation and sealingPoor sealing causes leaks and drafts.Ask: How will you flash, insulate and seal each opening?
5. Interior and exterior trimTrim and capping are often separate.Ask: Is interior and exterior trim or capping included?
6. Old unit removalRemoval and disposal take time.Ask: Is removal and disposal of the old units included?
7. Lead-safe practices (pre-1978 homes)Replacing windows in older homes can disturb lead paint.Ask: If our home was built before 1978, are you lead-safe certified?
Materials
8. Product, series and glassSeries and glass package change performance and price.Ask: Which make and series, frame material and glass package (U-factor) are included?
9. Hardware and screensScreens and locks are easy to leave out.Ask: Are screens, locks and handles included?
Permit and site
10. Permit and who pulls itUnpermitted work can fail inspection, complicate insurance claims and cause problems when you sell.Ask: Is the permit included in the price, and will you pull it in your name?
11. Debris removal and cleanupDumpster and haul-away fees are a common add-on after the job starts.Ask: Is debris removal, including any dumpster and haul-away, included in the price?
12. Protection of your homeDamage to floors, landscaping or furniture is easier to resolve when the quote says who is responsible.Ask: How will you protect the house and yard, and who pays if something is damaged?
Schedule and money
13. Start date and durationWithout dates in writing, a job can slip for weeks with no recourse.Ask: What is your start date and how many working days will the job take? Can we put that in the contract?
14. Payment scheduleA large upfront deposit puts more of your money at risk before work is done. Some states limit deposits.Ask: How much deposit do you need, and when is each payment due?
15. Change-order processExtra work is where budgets usually grow. Written, pre-approved changes keep it under control.Ask: How are changes priced and approved? Will every change be in writing before the work is done?
16. Written exclusionsWhat a price does not include matters as much as what it does.Ask: What is not included in this price?
Warranties and paperwork
17. Workmanship warrantyThis covers the installation itself, which is separate from any product warranty.Ask: How long is your workmanship warranty, what does it cover, and does it transfer if we sell?
18. Manufacturer warrantySome product warranties only apply if the installer registers them.Ask: Which product warranties apply, and who registers them?
19. License and insurance proofIf an uninsured worker is hurt on your property, you could be exposed.Ask: Can you send your license or registration number and certificates for liability and workers' compensation insurance?

General information, not professional advice. Local codes and licensing rules vary.